EcoSolutions Projects

EcoSolutions

For years, EcoSolutions has been dedicated to improving efficiency through the conservation of key resources such as water, fuel, chemical products, and electricity.

Water saved
+ 0 m3
Fuel saved
+ 0 m3
Chemicals saved
+ 0 m3
Energy saved
+ 0 MW

Hotel Hilton Liberia

201 kwp Photovoltaic System

Implementation of the ISO 50001 System, making Hilton Liberia the first certified hotel in the region.

 

Bridgestone

Biomass Boiler Installation

Results Achieved

Equivalent to over 820,000 trees planted

Savings of over 22,000,000 liters of bunker fuel

Prevented the emission of over 75,000 tons of CO₂

Hotel Intercontinetal

Biomass Boiler Installation

Achieve up to 50% savings in fuel costs — one of the many benefits companies gain by using biomass energy instead of bunker fuel, LPG gas, or diesel.

Results Achieved

  • Boiler Manufacturer: Binder (Austria) – 850 kW
  • Biomass Consumption: 55 tons per month
  • 100% replacement of diesel consumption

P.F. Chang's

Energy Compensation

Results Achieved

Electrical consumption reduction 15%

Current harmonics reduced from 22% to < 3.5%

Power factor 0.99%

Voltage fluctuations below 5%

Clients